Project Name
|
Project Purpose
|
Further Information
|
Project Manager
|
|
Network Management Systems Upgrade
|
To integrate, and expand if required, the current network monitoring
applications of the ICN specifically for network performance monitoring and
reporting. To produce a single, authoratative, dedicated database of all
Networks and Communications infrastructure. A single web portal front-end to
access and change the infrastructure information.
|
Project Scope
Project Plan
Project Status
|
Ben Carbery
|
|
UPS Roll-out
|
To install Uninterruptable Power Supplies (UPSs) across the ANU ICN, in
support of the next generation switch upgrade project and the ICN core upgrade
project.
|
Project Scope
Project Plan
Project Status
|
Geoff Barlow
|
|
Communication Rooms Audit
|
To audit and upgrade the communication room environments and provide
recommendations and input into a policy on communications cabinets across the
ANU ICN.
|
Project Scope
Project Plan
Project Status
|
Geoff Barlow
|
|
Next Generation Switch Upgrade
|
To upgrade the existing distribution and edge switch infrastructure of the
ICN to next generation Enterasys swtich hardware.
|
Project Scope
Project Plan
Project Status
|
Matthew Noakes
|
|
eduroam
|
The main aims of this project are to achieve the Eduroam status of deployed
for the university, educate university staff and students on the Eduroam system
and the setup of appropriate support structures
|
Project Scope
Project Plan
Project Status
|
Roy Meuronen
|
|
Baseband Media Replacement
|
This project aims to upgrade the current television receivers within Leonard
Huxley and to provide streaming video, via multicast, of television to the
desktop for users on the ICN.
|
Project Scope
Project Plan
Project Status
|
Roy Meuronen
|
|
Switch Visibility Implementation
|
To provide Local Information Technology Support Staff (LITTS) at the
Australian National University (ANU) with visibility to the new Enterasys
switches that are being rolled out across campus.
|
Project Scope
Project Plan
Project Status
|
Theo Karner
|
|
Video Conferencing Deployment
|
To implement multiple video conferencing services for distributed ANU staff
and students in environments internal and external to the ANU campus. This will
provide a platform for collaboration into the future.
|
Project Scope
Project Plan
Project Status
|
Roy Meuronen (DOI Wide Project)
|
|
Intrusion Detection & Prevention Hardware
|
To evaluate and analyse current Intrusion Detection Systems (IDS) and
Intrusion Prevention Systems (IPS) for deployment on the ANU ICN. The
acquisition, installation and deployment of a chosen IDS/IPS will also be
completed.
|
Project Scope
Project Plan
Project Status
|
Ben Carbery
|
|
Wireless Network Analysis
|
To conduct a thorough analysis of the current wireless network and evaluate
requirements of the university community for a wireless network. Then to use
this information in plannning and implementing the extension of the wireless
network to meet the requirements of the university community.
|
Project Scope
Project Plan
Project Status
|
Roy Meuronen
|
|
Wireless Network Infrastructure Extension
|
To use the information for the wireless network analysis project to upgrade
existing wireless access points and roll-out additional access points for the
ANU wireless network.
|
Project Scope
Project Plan
Project Status
|
Craig Shoard
|
|
Core Services Upgrade
|
This project defines the conversion of the ICN core to a layer 3 or
routed core, resulting in a significant improvement to the performance
and stability of the ICN core. This includes the InfoCommons redesign which is a
pre-requisite.
|
Project Scope/Plan
Project Status
|
Ben Carbery
|
|
Access & Security Policy to the edge
|
To develop and implement security policies on the ICN using the Enterasys
switching equipment and Netsight Policy Manager.
|
Project Scope
Project Plan
Project Status
|
Ben Carbery
|
|
Redundant Fibre Roll-out
|
To install new fibre to allow for physical redundancy to all core nodes and
distribution nodes of the ICN at Acton campus.
|
Project Scope
Project Plan
Project Status
|
Craig Shoard
|
|
Unified Messaging
|
To upgrade the current Octel voice mail system. Value-add's such as
voice-mail via email will be investigated.
|
Project Scope
Project Plan
Project Status
|
Wes Dinsmore
|
|
EC500
|
Implement EC500 on corporate IP handsets. Including a charging model and
marketing of the new service.
|
Project Scope
Project Plan
Project Status
|
Wes Dinsmore
|
|
IP Telephony Directory Function implementation
|
Implement the LDAP search function on the IP handsets.
|
Project Scope
Project Plan
Project Status
|
Theo Karner
|
|
Kioloa Communication Services Upgrade
|
Kioloa Coastal Campus is developing into a flagship field station and
education campus for the ANU. To this end Networks and Communications is tasked
to develop future scenarios, and the technology design that enables cutting edge
teaching, learning and research services.
|
Project Scope
Project Plan
Project Status
|
Craig Shoard
|
|
Resnet
|
To design and implement a student residential network for Fenner Hall,
Unilodge, Graduate House, Toad, Bruce, Burton & Garron, Burgmann, John XXIII
& Ursies. This will provide dedicated 1 Gbps links between the student halls
& Colleges.
|
Project Scope
Project Plan
Project Status
|
Darren Coleman
|
|
Gig. E & Hi-Fidelity IP Telephony Handsets
|
|
Project Scope
Project Plan
Project Status
|
Wes Dinsmore
|
|
VoWLAN Handsets
|
|
Project Scope
Project Plan
Project Status
|
Wes Dinsmore
|
|
IPv6 (Advanced Comms.)
|
|
Project Scope
Project Plan
Project Status
|
Andrew Howard
|
|
Presence (Advanced Comms.)
|
|
Project Scope
Project Plan
Project Status
|
Andrew Howard
|
|
Web Streaming & ANU TV (Advanced Comms.)
|
|
Project Scope
Project Plan
Project Status
|
Andrew Howard
|
|
SIP (Advanced Comms.)
|
|
Project Scope
Project Plan
Project Status
|
Darren Coleman
|
|
Unified Communications Solutions
|
|
Project Scope
Project Plan
Project Status
|
Roy Meuronen
|
|
Emergency Communications System
|
To investigate the current emergency communications systems on campus and
supplement or increase the functional capacity of these systems if required.
|
Project Scope
Project Plan
Project Status
|
Craig Shoard
|
|
DR Radio Acton
|
To revise and insure the quality, coverage and use of the Disaster Recovery
Radio for Acton Campus. This includes investigation into alternative DR links
for campus networks that will provide 1 Gbps.
|
Project Scope
Project Plan
Project Status
|
Craig Shoard
|
|
ANU Exchange Area Network
|
|
Project Scope
Project Plan
Project Status
|
Craig Shoard
|
|
LITSS Training Program
|
To produce, test and provide a training program for ANU Local IT Support
Staff (LITSS), Student LITSS and Infoplace consultants for working in the ANU
ICN environment. This will include any relevant standards, policies or
procedures and best practices. This program is to be delivered via multiple
channels, i.e., video, web, face-to-face.
|
Project Scope
Project Plan
Project Status
|
Kylie Paintain
|
|
Test Lab Build
|
|
Project Scope
Project Plan
Project Status
|
Ben Carbery
|